Friday 3 June 2011

Kitchen Installation Day 3

We are now seeing the fruits of Bobby's labours. All the wall and base units have been fixed, and the doors have been fitted to all of them except for the Fridge/Freezer Unit, and Oven /Microwave Unit. The worktops are now fully fitted too!


The wall units, complete with doors, either side of the extractor fan.

 
The Base Units, below the wall units above, and complete with doors and worktops. The hole in the worktop is where the hob will be fitted. 


The base units with doors fitted. The hole in this worktop is where the sink and drainer will be fitted. The gap to the right is for the washer.


The wall units on the exterior wall, with doors fitted, the central unit having display widows, so that all the Bentley silver and crown jewels can be on display!


Of course during all this time Ruby has not been unoccupied. She has made it in her way to oversee all the work in hand, and check that it was carried out to her demanding standards!

She has been spoilt something rotten by Bobby. When he arrived he was eating a sandwich, and Ruby being the crafty soul she is convinced him that she was a poor, starving, undernourished dog. In no time at all Bobby was sharing his sandwich with her!

Later Ben and Hannah called, and it was so hot that Hannah went to buy some ice cream lollies. Once again Ruby put on her "I'm a poor, starving, undernourished dog" act, and got a lick of Ben's ice cream lolly.

Later on in the afternoon, Sarah and Raffi turned up, so there was time for fun and frolics then.

It being a very hot day today, once she had finished she decided to take a well earned rest.

1 comment:

  1. For this kind of job, you can only trust a professional handyman. Good thing you can just find them online.

    ReplyDelete