Above is the new oven and gas hob fitted.
The new sink and washer fitted.
The Fridge/Freezer in its housing.
The pan (or plate) drawer with inset cutlery drawer above it.
The new sink with one and a half bowls.
The new gas hob.
Gradually it's all taking shape. We expect the electrician in today to connet the oven and the fridge freezer, then we will have a fully working kitchen!
All that remains now is the wall tiling, the floor tiling, decorating - oh! and two new doors fitting (one between the kitchen and hall, and one between the hall and the lounge). Then some semblence of peace may reign in the Bentley household once more!
No comments:
Post a Comment