We now have all the doors (except the one which covers the extractor fan) fitted, and all the knobs fitted except one. The observant of you will have noticed that the wall units on the outside wall have been lowered, so that a certain female can reach the top shelves!
All being well the plumber will be on the doorstep at 08.00 prompt and by the afternoon the Gas Hob, and sinks (yes there is a full sized sink and a half sink!) will be in full working order. The washer should also be in situ and in full working order too!
The radiator will have been moved back to the outside wall and should also be in full working order.
The Fridge/Freezer Unit on the left, and on the right, spaces for the Cooker and Microwave to be fitted.
A fuller view of the units, showing the top cupboards and large pan drawer, (below where the oven will be fitted.)
The triple wall unit on the outside wall, which has been lowered.
We are also expecting the arrival of a workman to remove and fit new fencing in the back garden, between nos 69 & 71, and also along the back of the garden too.
No comments:
Post a Comment